Texas

Bitcoin mining hosting in Texas

GoGo Tech hosts bitcoin miners in Fort Worth, Texas on the ERCOT grid: a 30 MW hydro-cooled site with 12 MW available now plus an 18 MW second phase, sold as 2 MW MDUs ($1,200,000 each). Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

How it works

Buy the unit. We host it on the Fort Worth hydro-cooled site.

  1. 01

    Buy the MDU

    You purchase a hydro-cooled 2 MW Modular Datacenter Unit from GoGo Tech. It costs $1,200,000, and it accepts WhatsMiner, SealMiner, VolcMiner, and Auradine. The unit is yours.

  2. 02

    We deploy it on our site

    GoGo Tech installs the unit on the Fort Worth hydro-cooled mining site on the ERCOT grid.

  3. 03

    The monthly charge follows kilowatt-hours

    The monthly hosting charge is the kilowatt-hours your MDU consumes, measured by the smart meters on the unit.

  4. 04

    Pass-through power and operations

    Power is passed through without markup, plus $0.01/kWh for management and operations. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh. On-site technicians deploy and service your miners, and the operations software is included.

Power

ERCOT grid power

Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.

Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power.

  • Grid-powered. The Fort Worth hydro-cooled mining site buys from the ERCOT power pool at live-market rates. Target a rate; the included software handles the rest.
  • PPA signed with Shell Energy.
  • Utility: Oncor. Oncor is building the power lines.
  • In development. No commercial-operation month has been set.

Hydro-cooled bitcoin mining hosting

Pricing

How pass-through pricing works

Hosting on this site is the kilowatt-hours the MDU consumes. Power is the rate for the site, passed through without markup, plus $0.01/kWh for management and operations. The worked example, and how the two lines move, is on the pass-through pricing page.

Pass-through pricing

Company

Track record

  • Operating in Bitcoin mining since 2014. GoGo Technologies LLC formed January 18, 2018. Privately held.
  • Built a 1.75 MW mining site in Washington (2018), under management.
  • Built and managed infrastructure for 3,000+ Nvidia GPUs across 5 facilities in Washington (2022).
  • Built a 2.2 MW mining site in Washington (2024), under management.

FAQ

Where can I host my bitcoin miners in Texas?

GoGo Tech hosts bitcoin miners in Fort Worth, Texas on the ERCOT grid: a 30 MW hydro-cooled site with 12 MW available now plus an 18 MW second phase, sold as 2 MW MDUs ($1,200,000 each). Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

What size is the Fort Worth MDU, and what does it cost?

It is a hydro-cooled 2 MW Modular Datacenter Unit priced at $1,200,000 each. Supported miners are WhatsMiner, SealMiner, VolcMiner, and Auradine. Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase.

How is Fort Worth hosting priced?

Power is pass-through: the rate for the site, passed through without markup, plus $0.01/kWh for management and operations. Technicians and the operations software are included. GoGo Tech does not quote an all-in rate. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

What does hydro-cooled mean, and who supplies the power?

Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power. The PPA is signed with Shell Energy. The site buys from the ERCOT power pool at live-market rates. The utility is Oncor.

Has a commercial-operation month been set for Fort Worth?

The site is in development. No commercial-operation month has been set. Oncor is building the power lines.

Do I own the Modular Datacenter Unit, and who services the miners?

Yes. You buy the MDU from GoGo Tech, and the unit is yours. GoGo Tech hosts it on the Fort Worth site. On-site technicians deploy and service your miners, and the operations software is included at no extra charge.

Reserve a unit.

Tell us you want a hydro-cooled MDU on the Fort Worth site.