Texas
Bitcoin mining hosting in Texas
GoGo Tech hosts bitcoin miners in Fort Worth, Texas on the ERCOT grid: a 30 MW hydro-cooled site with 12 MW available now plus an 18 MW second phase, sold as 2 MW MDUs ($1,200,000 each). Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.
How it works
Buy the unit. We host it on the Fort Worth hydro-cooled site.
01
Buy the MDU
You purchase a hydro-cooled 2 MW Modular Datacenter Unit from GoGo Tech. It costs $1,200,000, and it accepts WhatsMiner, SealMiner, VolcMiner, and Auradine. The unit is yours.
02
We deploy it on our site
GoGo Tech installs the unit on the Fort Worth hydro-cooled mining site on the ERCOT grid.
03
The monthly charge follows kilowatt-hours
The monthly hosting charge is the kilowatt-hours your MDU consumes, measured by the smart meters on the unit.
04
Pass-through power and operations
Power is passed through without markup, plus $0.01/kWh for management and operations. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh. On-site technicians deploy and service your miners, and the operations software is included.
Power
ERCOT grid power
Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.
Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power.
- Grid-powered. The Fort Worth hydro-cooled mining site buys from the ERCOT power pool at live-market rates. Target a rate; the included software handles the rest.
- PPA signed with Shell Energy.
- Utility: Oncor. Oncor is building the power lines.
- In development. No commercial-operation month has been set.
Pricing
How pass-through pricing works
Hosting on this site is the kilowatt-hours the MDU consumes. Power is the rate for the site, passed through without markup, plus $0.01/kWh for management and operations. The worked example, and how the two lines move, is on the pass-through pricing page.
Company
Track record
- Operating in Bitcoin mining since 2014. GoGo Technologies LLC formed January 18, 2018. Privately held.
- Built a 1.75 MW mining site in Washington (2018), under management.
- Built and managed infrastructure for 3,000+ Nvidia GPUs across 5 facilities in Washington (2022).
- Built a 2.2 MW mining site in Washington (2024), under management.
FAQ
Where can I host my bitcoin miners in Texas?
- GoGo Tech hosts bitcoin miners in Fort Worth, Texas on the ERCOT grid: a 30 MW hydro-cooled site with 12 MW available now plus an 18 MW second phase, sold as 2 MW MDUs ($1,200,000 each). Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.
What size is the Fort Worth MDU, and what does it cost?
- It is a hydro-cooled 2 MW Modular Datacenter Unit priced at $1,200,000 each. Supported miners are WhatsMiner, SealMiner, VolcMiner, and Auradine. Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase.
How is Fort Worth hosting priced?
- Power is pass-through: the rate for the site, passed through without markup, plus $0.01/kWh for management and operations. Technicians and the operations software are included. GoGo Tech does not quote an all-in rate. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.
What does hydro-cooled mean, and who supplies the power?
- Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power. The PPA is signed with Shell Energy. The site buys from the ERCOT power pool at live-market rates. The utility is Oncor.
Has a commercial-operation month been set for Fort Worth?
- The site is in development. No commercial-operation month has been set. Oncor is building the power lines.
Do I own the Modular Datacenter Unit, and who services the miners?
- Yes. You buy the MDU from GoGo Tech, and the unit is yours. GoGo Tech hosts it on the Fort Worth site. On-site technicians deploy and service your miners, and the operations software is included at no extra charge.
Reserve a unit.
Tell us you want a hydro-cooled MDU on the Fort Worth site.
