Hydro-cooled MDUs and panels from $300,000 · Texas and North DakotaReserve hydro

Colocation

Ship your miners.We plug them in.

One rate for any miner: $0.075/kWh all-in for mining operations (power + ops while hashing). Shipping and logistics are quoted separately.

Miners racked and cabled inside a GoGo Tech MDU.
Air-cooledHydro-cooled

The rate card.

RateAll-in covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.
$0.075/kWh all-in
Minimum
10 miners
DepositTwo months of the estimated monthly cost.
2 months
Air-cooled miners
North Dakota
Hydro-cooled miners
Texas (Fort Worth area) or North Dakota
BillingSmart meters on every unit.
Monthly, per kWh
Software
Platform and phone app included

Freight

Shipping and logisticsare quoted separately.

Shipping and logistics are quoted separately.

We can help arrange freight through our corporate XPO account.

Before pickup

  • Pack each miner with its power cord.
  • Share the serial list before pickup.

Estimate your colocation cost.

Monthly cost and deposit at 90% uptime.

Cooling

Estimated monthly cost

$3,449

One-time

Energy depositTwo months of the estimated monthly cost, due before your miners are energized
$6,899

Monthly

Rate, all-inAll-in covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.
$0.075/kWh
IT load
70 kW
Energy per month
45,990 kWh
Estimated monthly cost
$3,449
Minimum
10 miners · met

Estimate only. Billing follows the smart-meter reading.

Intake

Four stepsto online.

Target: 3 months from contract to hashing.

  1. 01

    Send your miner list

    Models, counts and wall power.

  2. 02

    Agree and energy deposit

    Sign the agreement. The energy deposit is two months of the estimated monthly cost, due before your miners are energized.

  3. 03

    Ship to site

    Shipping and logistics are quoted separately. We can help arrange freight through our corporate XPO account.

  4. 04

    Online, billed per kWh

    Smart-meter billing at $0.075/kWh.

Platform

See every miner. Pay what the meter says.

Fleet, power and uptime, invoices and alerts, on the web and in the phone app.

Fleet overview screen in the GoGo Tech platform.

Colocation questions

What does colocation cost?

$0.075/kWh all-in for any miner, air-cooled or hydro-cooled. That rate covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.

Is there a minimum or an energy deposit for colocation?

Yes. The minimum is 10 miners per order. The energy deposit is two months of the estimated monthly cost, due before your miners are energized. The colocation calculator shows the amount.

Which miners can I colocate?

Air-cooled miners run in North Dakota. Hydro-cooled miners run in Texas (Fort Worth area) or North Dakota. Send your model list and we confirm fit.

How is colocation billed?

Monthly, on the kWh your miners consume as recorded by the smart meters, at $0.075/kWh.

What software comes with hosting?

The GoGo Tech platform is included: fleet view, power and uptime, billing and payments, support and alerts, and a phone app.

Who services my miners?

GoGo Tech on-site technicians install, repair and service miners at every site.

Intake

What to have ready.

Miner list

  • Models and counts (10 miner minimum)
  • Wall power per miner
  • Air-cooled or hydro-cooled

Agreement

  • Colocation agreement signed
  • Energy deposit: two months of the estimated monthly cost, due before your miners are energized
  • Billing contact and pool details

Shipping and logistics

  • Shipping and logistics are quoted separately
  • We can help arrange freight through our corporate XPO account
  • Pack each miner with its power cord
  • Share the serial list before pickup

Online

  • Miners appear in the platform and phone app
  • Monthly invoice from smart-meter kWh
  • Support at support@gogotech.org

Colocate your miners.

Send your miner list. 10 miner minimum.