Pricing
Published prices.No surprises in the math.
Buy dedicated capacity, bring your own hydro container, or colocate your miners. The purchase price is due in full at purchase. The energy deposit is separate.
Buy
MDUs and panels.From $175,000.
You're buying dedicated power capacity reserved for your MDU or panel, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase. You sign the Purchase and Lease Agreement (PLA). The air-cooled 300 kW panel is natural gas only; the 500 kW air-cooled panel is grid only.
| Unit | Capacity | Location | Power | Price |
|---|---|---|---|---|
| Air-cooled MDU | 1 MW | North Dakota | GasGrid | $500,000 |
| Air-cooled panel | 300 kW | North Dakota | Gas | $175,000 |
| Air-cooled panel | 500 kW | North Dakota | Grid | $300,000 |
| Hydro-cooled MDU | 2 MW | Texas (Fort Worth area) or North Dakota | GasGrid | $1,000,000 |
| Hydro-cooled panel | 1 MW | Texas (Fort Worth area) or North Dakota | GasGrid | $550,000 |
| Hydro-cooled panel | 500 kW | Texas (Fort Worth area) or North Dakota | GasGrid | $300,000 |
MDU and panel owners
$0.035/kWh gas · $0.035–$0.04/kWh gridNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA. On grid the rate is pass-through and varies with the market ($0.035–$0.04/kWh in our estimates).
Natural gas: $0.035/kWh, fixed for 10 years. Grid: $0.035–$0.04/kWh, pass-through, varies with the market.
+ $0.01/kWh
management
- Purchase price (due in full at purchase)
- Due in full
- Energy deposit
- one month of estimated energy + management, due before your unit is energized
- Agreement
- Purchase and Lease Agreement (PLA)
- Lead time
- 3 months from contract to hashing
Colocation, your miners
$0.075/kWh all-inAll-in covers mining operations only: power and ops while hashing. Shipping and logistics are quoted separately.
any miner, air-cooled or hydro-cooled
- Minimum
- 10 miners
- Energy deposit
- two months of the estimated monthly cost, due before your miners are energized
- Locations
- North Dakota; Texas for hydro-cooled
Estimate an MDU or panel.
Purchase price (due in full at purchase), energy deposit and the monthly lease charge (metered energy + $0.01/kwh management), at 90% uptime. When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized.
Location: North Dakota
Purchase price (due in full at purchase)
$500,000
Dedicated capacity (MDU + site infrastructure)
One-time
- Purchase price (due in full at purchase)You're buying dedicated power capacity reserved for your MDU, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase.
- $500,000
- Energy depositOne month of estimated energy + management, due before your unit is energized
- $29,565
- Lead time
- 3 months from contract to hashing
Monthly
- IT load
- 1 MW
- Energy per month
- 657,000 kWh
- Power at $0.035/kWhNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.
- $22,995
- Management at $0.01/kWh
- $6,570
- Monthly lease charge (metered energy + $0.01/kWh management)
- $29,565
When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. On natural gas, you also sign a PPA issued by GoGo Tech. The rate is $0.035/kWh, fixed for 10 years. Estimate only. Billing follows the smart-meter reading.
Estimate colocation.
$0.075/kWh all-in, 10 miner minimum, two-month energy deposit, at 90% uptime.
Estimated monthly cost
$3,449
One-time
- Energy depositTwo months of the estimated monthly cost, due before your miners are energized
- $6,899
Monthly
- Rate, all-inAll-in covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.
- $0.075/kWh
- IT load
- 70 kW
- Energy per month
- 45,990 kWh
- Estimated monthly cost
- $3,449
- Minimum
- 10 miners · met
Estimate only. Billing follows the smart-meter reading.
Gas vs grid
How the monthly lease charge is set.
On natural gas, you sign the Purchase and Lease Agreement (PLA) and a PPA issued by GoGo Tech; the rate is $0.035/kWh, fixed for 10 years. On grid, GoGo Tech holds the utility PPA, you sign only the PLA, and the pass-through rate varies with the market.
Current rate
Natural gas $0.035/kWh, fixed for 10 years. Grid $0.035–$0.04/kWh, pass-through. Management $0.01/kWh
| Line item | What it is | Who sets it |
|---|---|---|
| Power | The kWh your MDU consumes, at the rate GoGo Tech negotiated, passed through without markup | The utility or power contract for that site |
| Management and operations | $0.01 per kWh consumed, covering technicians who deploy and service your miners; operations software included | Fixed at $0.01/kWh |
- With pass-through pricing, your cost follows the underlying power rate. When power is cheaper, you pay less. When it costs more, you pay more.
- The $0.01/kWh operations fee doesn't change.
- On grid, power is pass-through and varies with the market. You can set a target rate, and the included software handles the rest (curtailing load during peaks, for example). On natural gas the rate is $0.035/kWh, fixed for 10 years under a PPA issued by GoGo Tech.
- An all-in rate is predictable, but the provider's margin is built into every kWh. GoGo Tech's only all-in rate is colocation: $0.075/kWh for customer-owned miners.
- Buying an MDU or panel requires an energy deposit: one month of estimated energy + management, due before your unit is energized. The purchase price is due in full at purchase and is separate from the energy deposit.
Worked example (ILLUSTRATIVE ONLY; not a quote or an offer)
ILLUSTRATIVE ONLY. Not a quote or an offer. The figures taken from this site are the air-cooled 1 MW MDU size, the $0.01/kWh management fee and the $0.075/kWh colocation rate. The power rates are made-up round numbers to show the arithmetic. The colocation row uses the published $0.075/kWh all-in rate. The current owner rates are $0.035/kWh on natural gas and $0.035–$0.04/kWh on grid, plus $0.01/kWh management.
MDU size: 1 MW (the North Dakota air-cooled MDU size). Load: full load, 24 hours a day, for 30 days. This is illustrative; real consumption is whatever the smart meters record, and curtailment lowers it. 1,000 kW × 720 h = 720,000 kWh. This worked example shows how a grid pass-through bill moves when the market rate moves. On natural gas the rate is $0.035/kWh, fixed for 10 years.
| Scenario | Power rate | + Ops fee | Effective rate | Monthly bill |
|---|---|---|---|---|
| Pass-through, illustrative power rate $0.040 | $0.040 | $0.010 | $0.050 | 720,000 × $0.050 = $36,000 ($28,800 power + $7,200 ops) |
| Pass-through, illustrative power rate falls to $0.030 | $0.030 | $0.010 | $0.040 | 720,000 × $0.040 = $28,800 |
| Pass-through, illustrative power rate rises to $0.060 | $0.060 | $0.010 | $0.070 | 720,000 × $0.070 = $50,400 |
| GoGo Tech colocation, $0.075 all-in (customer-owned miners, for comparison) | bundled | bundled | $0.075 | 720,000 × $0.075 = $54,000 in every month |
In every pass-through row, the ops portion is the same $7,200 (720,000 kWh × $0.01). Only the power line moves. The current rate is separate from this table.
Pricing questions
Is the purchase price due in full?
Yes. The purchase price for an MDU or panel is due in full at purchase. The energy deposit is separate: it is not a deposit toward that purchase price.
What is the energy deposit when I buy an MDU or panel?
The energy deposit is one month of estimated energy + management, due before your unit is energized. It is not a deposit toward the purchase price. The MDU calculator shows the amount.
What agreement do I sign?
When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). If you bring your own hydro MDU, you sign a lease. On natural gas, you also sign a PPA issued by GoGo Tech, and the rate is $0.035/kWh, fixed for 10 years. On grid, GoGo Tech already holds the utility PPA, so you sign only the PLA, or only a lease if you bring your own, and pay the pass-thru rate, which varies with the market, plus $0.01/kWh Operations and Management.
What is the difference between natural gas and grid?
On natural gas, you sign the Purchase and Lease Agreement (PLA) — or a lease if you bring your own hydro container — and a PPA issued by GoGo Tech. The power rate is $0.035/kWh, fixed for 10 years. On grid, GoGo Tech has already signed the PPA with the utility and holds it. You sign only the PLA, or only a lease for bring-your-own, and pay the pass-through rate, which varies with the market, plus $0.01/kWh management. In both cases the monthly lease charge is metered energy times the power rate, plus $0.01/kWh management.
What does colocation cost?
$0.075/kWh all-in for any miner, air-cooled or hydro-cooled. That rate covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.
Is there a minimum or an energy deposit for colocation?
Yes. The minimum is 10 miners per order. The energy deposit is two months of the estimated monthly cost, due before your miners are energized. The colocation calculator shows the amount.