Hydro-cooled MDUs and panels from $300,000 · Texas and North DakotaReserve hydro

Pricing

Published prices.No surprises in the math.

Buy dedicated capacity, bring your own hydro container, or colocate your miners. The purchase price is due in full at purchase. The energy deposit is separate.

Buy

MDUs and panels.From $175,000.

You're buying dedicated power capacity reserved for your MDU or panel, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase. You sign the Purchase and Lease Agreement (PLA). The air-cooled 300 kW panel is natural gas only; the 500 kW air-cooled panel is grid only.

UnitCapacityLocationPowerPrice
Air-cooled MDU1 MWNorth DakotaGasGrid$500,000
Air-cooled panel300 kWNorth DakotaGas$175,000
Air-cooled panel500 kWNorth DakotaGrid$300,000
Hydro-cooled MDU2 MWTexas (Fort Worth area) or North DakotaGasGrid$1,000,000
Hydro-cooled panel1 MWTexas (Fort Worth area) or North DakotaGasGrid$550,000
Hydro-cooled panel500 kWTexas (Fort Worth area) or North DakotaGasGrid$300,000

MDU and panel owners

$0.035/kWh gas · $0.035–$0.04/kWh gridNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA. On grid the rate is pass-through and varies with the market ($0.035–$0.04/kWh in our estimates).

Natural gas: $0.035/kWh, fixed for 10 years. Grid: $0.035–$0.04/kWh, pass-through, varies with the market.

+ $0.01/kWh

management

Purchase price (due in full at purchase)
Due in full
Energy deposit
one month of estimated energy + management, due before your unit is energized
Agreement
Purchase and Lease Agreement (PLA)
Lead time
3 months from contract to hashing

Colocation, your miners

$0.075/kWh all-inAll-in covers mining operations only: power and ops while hashing. Shipping and logistics are quoted separately.

any miner, air-cooled or hydro-cooled

Minimum
10 miners
Energy deposit
two months of the estimated monthly cost, due before your miners are energized
Locations
North Dakota; Texas for hydro-cooled

Estimate an MDU or panel.

Purchase price (due in full at purchase), energy deposit and the monthly lease charge (metered energy + $0.01/kwh management), at 90% uptime. When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized.

Cooling
Size
Power

Location: North Dakota

Power rateNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.

Purchase price (due in full at purchase)

$500,000

Dedicated capacity (MDU + site infrastructure)

One-time

Purchase price (due in full at purchase)You're buying dedicated power capacity reserved for your MDU, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase.
$500,000
Energy depositOne month of estimated energy + management, due before your unit is energized
$29,565
Lead time
3 months from contract to hashing

Monthly

IT load
1 MW
Energy per month
657,000 kWh
Power at $0.035/kWhNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.
$22,995
Management at $0.01/kWh
$6,570
Monthly lease charge (metered energy + $0.01/kWh management)
$29,565

When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. On natural gas, you also sign a PPA issued by GoGo Tech. The rate is $0.035/kWh, fixed for 10 years. Estimate only. Billing follows the smart-meter reading.

Estimate colocation.

$0.075/kWh all-in, 10 miner minimum, two-month energy deposit, at 90% uptime.

Cooling

Estimated monthly cost

$3,449

One-time

Energy depositTwo months of the estimated monthly cost, due before your miners are energized
$6,899

Monthly

Rate, all-inAll-in covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.
$0.075/kWh
IT load
70 kW
Energy per month
45,990 kWh
Estimated monthly cost
$3,449
Minimum
10 miners · met

Estimate only. Billing follows the smart-meter reading.

Gas vs grid

How the monthly lease charge is set.

On natural gas, you sign the Purchase and Lease Agreement (PLA) and a PPA issued by GoGo Tech; the rate is $0.035/kWh, fixed for 10 years. On grid, GoGo Tech holds the utility PPA, you sign only the PLA, and the pass-through rate varies with the market.

Current rate

Natural gas $0.035/kWh, fixed for 10 years. Grid $0.035–$0.04/kWh, pass-through. Management $0.01/kWh

Line itemWhat it isWho sets it
PowerThe kWh your MDU consumes, at the rate GoGo Tech negotiated, passed through without markupThe utility or power contract for that site
Management and operations$0.01 per kWh consumed, covering technicians who deploy and service your miners; operations software includedFixed at $0.01/kWh
  • With pass-through pricing, your cost follows the underlying power rate. When power is cheaper, you pay less. When it costs more, you pay more.
  • The $0.01/kWh operations fee doesn't change.
  • On grid, power is pass-through and varies with the market. You can set a target rate, and the included software handles the rest (curtailing load during peaks, for example). On natural gas the rate is $0.035/kWh, fixed for 10 years under a PPA issued by GoGo Tech.
  • An all-in rate is predictable, but the provider's margin is built into every kWh. GoGo Tech's only all-in rate is colocation: $0.075/kWh for customer-owned miners.
  • Buying an MDU or panel requires an energy deposit: one month of estimated energy + management, due before your unit is energized. The purchase price is due in full at purchase and is separate from the energy deposit.

Worked example (ILLUSTRATIVE ONLY; not a quote or an offer)

ILLUSTRATIVE ONLY. Not a quote or an offer. The figures taken from this site are the air-cooled 1 MW MDU size, the $0.01/kWh management fee and the $0.075/kWh colocation rate. The power rates are made-up round numbers to show the arithmetic. The colocation row uses the published $0.075/kWh all-in rate. The current owner rates are $0.035/kWh on natural gas and $0.035–$0.04/kWh on grid, plus $0.01/kWh management.

MDU size: 1 MW (the North Dakota air-cooled MDU size). Load: full load, 24 hours a day, for 30 days. This is illustrative; real consumption is whatever the smart meters record, and curtailment lowers it. 1,000 kW × 720 h = 720,000 kWh. This worked example shows how a grid pass-through bill moves when the market rate moves. On natural gas the rate is $0.035/kWh, fixed for 10 years.

ScenarioPower rate+ Ops feeEffective rateMonthly bill
Pass-through, illustrative power rate $0.040$0.040$0.010$0.050720,000 × $0.050 = $36,000 ($28,800 power + $7,200 ops)
Pass-through, illustrative power rate falls to $0.030$0.030$0.010$0.040720,000 × $0.040 = $28,800
Pass-through, illustrative power rate rises to $0.060$0.060$0.010$0.070720,000 × $0.070 = $50,400
GoGo Tech colocation, $0.075 all-in (customer-owned miners, for comparison)bundledbundled$0.075720,000 × $0.075 = $54,000 in every month

In every pass-through row, the ops portion is the same $7,200 (720,000 kWh × $0.01). Only the power line moves. The current rate is separate from this table.

Pricing questions

Is the purchase price due in full?

Yes. The purchase price for an MDU or panel is due in full at purchase. The energy deposit is separate: it is not a deposit toward that purchase price.

What is the energy deposit when I buy an MDU or panel?

The energy deposit is one month of estimated energy + management, due before your unit is energized. It is not a deposit toward the purchase price. The MDU calculator shows the amount.

What agreement do I sign?

When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). If you bring your own hydro MDU, you sign a lease. On natural gas, you also sign a PPA issued by GoGo Tech, and the rate is $0.035/kWh, fixed for 10 years. On grid, GoGo Tech already holds the utility PPA, so you sign only the PLA, or only a lease if you bring your own, and pay the pass-thru rate, which varies with the market, plus $0.01/kWh Operations and Management.

What is the difference between natural gas and grid?

On natural gas, you sign the Purchase and Lease Agreement (PLA) — or a lease if you bring your own hydro container — and a PPA issued by GoGo Tech. The power rate is $0.035/kWh, fixed for 10 years. On grid, GoGo Tech has already signed the PPA with the utility and holds it. You sign only the PLA, or only a lease for bring-your-own, and pay the pass-through rate, which varies with the market, plus $0.01/kWh management. In both cases the monthly lease charge is metered energy times the power rate, plus $0.01/kWh management.

What does colocation cost?

$0.075/kWh all-in for any miner, air-cooled or hydro-cooled. That rate covers mining operations only: power and ops while your miners are hashing. Shipping and logistics are quoted separately.

Is there a minimum or an energy deposit for colocation?

Yes. The minimum is 10 miners per order. The energy deposit is two months of the estimated monthly cost, due before your miners are energized. The colocation calculator shows the amount.