Deploy
We control the entire cycle.
Buy a Modular Datacenter Unit from GoGo Tech. We place it on a GoGo Tech site, pass through the utility rate we negotiated, and cover operations — technicians and software included.

Your hardware
You buy the MDU from GoGo Tech. The unit is yours.
Our sites
We deploy and host it on GoGo Tech power sites.
Pass-through power
The monthly lease is the kWh your MDU consumes, at the utility rate we negotiated.
Ops covered
$0.01 / kWh for management and operations, including technicians who deploy and service your miners. The operations software is included.
How it works
Buy. We deploy. You pay for the kilowatt-hours.
01
Buy the MDU
Purchase a Modular Datacenter Unit from GoGo Tech.
02
We deploy on site
GoGo Tech installs the unit on a GoGo Tech site.
03
Lease on kWh
You sign a lease. The monthly fee is based on kilowatt-hours consumed by your MDU.
04
Pass-through rate
GoGo Tech passes through the rate negotiated with the utility, plus $0.01 / kWh for management and operations.
05
Technicians and software
On-site technicians deploy and service your miners. The operations software is included — no extra charge with MDUs on our sites.
- Buy a mining container, we host it
- Bitcoin mining hosting in North Dakota
- Bitcoin mining hosting in Texas
- Hydro-cooled bitcoin mining hosting
- Own a facility vs host
- Pass-through pricing
See the operations software — included with every MDU we deploy on site.
Natural gas · North Dakota
Air-cooled MDUs on natural gas
A natural-gas mining opportunity in North Dakota.
GoGo Tech deploys air-cooled MDUs on our North Dakota natural-gas sites. You buy the unit; we place it on site and run the pad.
Power
Fleet of generators owned and maintained by GoGo Tech. Not the grid for this opportunity.
- Current ratePower (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh
- GPAGas purchase agreement with Phoenix
- GensetsProvided by Taylor
- PPAIssued by GoGo Tech
A later air-cooled site on grid power may follow.
- Cooling
- Air-cooled
- Capacity
- 1 MW each
- Price
- $500,000 each
- Slots
- 340
- Panels
- 3
- Miners
- Any air-cooled miner

Hydro-cooled · Fort Worth, Texas
Hydro-cooled MDUs on ERCOT grid power
'Hydro' refers to liquid (water) cooling of the miners, not hydroelectric power. Fort Worth runs on ERCOT grid power.
Hydro-cooled mining in Fort Worth.
The Fort Worth hydro-cooled mining site buys from the ERCOT power pool at live-market rates. Target a rate; the included software handles the rest.
Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.
Bitcoin mining hosting in Texas · Hydro-cooled bitcoin mining hosting
Included software applies your target rate and the rest of the operations suite.
Power
Grid-powered.
- Current ratePower (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh
- PPASigned with Shell Energy
- PoolBuying from the ERCOT power pool
- UtilityOncor
- Cooling
- Hydro-cooled
- Capacity
- 2 MW each
- Available capacity
- 12 MW
- Price
- $1,200,000 each
- Miners
- WhatsMiner, SealMiner, VolcMiner, Auradine

Hydro-cooled · Fort Worth, Phase 2
Fort Worth, Phase 2
Hydro-cooled mining in Fort Worth.
The Fort Worth hydro-cooled mining site buys from the ERCOT power pool at live-market rates. Target a rate; the included software handles the rest.
Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.
Bitcoin mining hosting in Texas · Hydro-cooled bitcoin mining hosting
Included software applies your target rate and the rest of the operations suite.
Power
Grid-powered.
- Current ratePower (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh
- PPASigned with Shell Energy
- PoolBuying from the ERCOT power pool
- UtilityOncor
- Cooling
- Hydro-cooled
- Capacity
- 2 MW each
- Available capacity
- 18 MW
- Price
- $1,200,000 each
- Miners
- WhatsMiner, SealMiner, VolcMiner, Auradine

Reserve a unit.
Tell us which site and how many MDUs. We will follow up on availability, delivery, and the lease.