Deploy

We control the entire cycle.

Buy a Modular Datacenter Unit from GoGo Tech. We place it on a GoGo Tech site, pass through the utility rate we negotiated, and cover operations — technicians and software included.

GoGo Tech controls the full cycle from power generation through MDU operations.
  • Your hardware

    You buy the MDU from GoGo Tech. The unit is yours.

  • Our sites

    We deploy and host it on GoGo Tech power sites.

  • Pass-through power

    The monthly lease is the kWh your MDU consumes, at the utility rate we negotiated.

  • Ops covered

    $0.01 / kWh for management and operations, including technicians who deploy and service your miners. The operations software is included.

How it works

Buy. We deploy. You pay for the kilowatt-hours.

  1. 01

    Buy the MDU

    Purchase a Modular Datacenter Unit from GoGo Tech.

  2. 02

    We deploy on site

    GoGo Tech installs the unit on a GoGo Tech site.

  3. 03

    Lease on kWh

    You sign a lease. The monthly fee is based on kilowatt-hours consumed by your MDU.

  4. 04

    Pass-through rate

    GoGo Tech guarantees a pass-through of the rate negotiated with the utility, plus $0.01 / kWh for management and operations.

  5. 05

    Technicians and software

    On-site technicians deploy and service your miners. The operations software is included — no extra charge with MDUs on our sites.

See the operations softwareincluded with every MDU we deploy on site.

Natural gas · North Dakota

Air-cooled MDUs on natural gas

A natural-gas mining opportunity in North Dakota.

GoGo Tech deploys air-cooled MDUs on our North Dakota natural-gas sites. You buy the unit; we place it on site and run the pad.

Power

Fleet of generators owned and maintained by GoGo Tech. Not the grid for this opportunity.

  • All-in kWh rate$0.045 / kWh
  • GPAGas purchase agreement with Phoenix
  • GensetsProvided by Taylor
  • PPAIssued by GoGo Tech

A later air-cooled site on grid power may follow.

Cooling
Air-cooled
Capacity
1 MW each
Price
$500,000 each
All-in kWh rate
$0.045 / kWh
Slots
340
Panels
3
Miners
Any air-cooled miner

Get in touch

Natural-gas mining site with generator sets and air-cooled MDUs in North Dakota.

Hydro mining · Fort Worth, Texas

Hydro MDUs on grid power

Hydro mining in Fort Worth.

The Fort Worth Hydro Mining Site buys from the ERCOT power pool at live-market rates. Target a rate; the included software handles the rest.

Included software applies your target rate and the rest of the operations suite.

Power

Grid-powered.

  • All-in kWh rate$0.045 / kWh
  • PPASigned with Shell Energy
  • PoolBuying from the ERCOT power pool
  • UtilityOncor
Cooling
Hydro
Capacity
2 MW each
Available capacity
12 MW
Price
$1,100,000 each
All-in kWh rate
$0.045 / kWh
Miners
WhatsMiner, SealMiner, VolcMiner, Auradine

Get in touch

Hydro mining containers and coolant tanks at the Fort Worth Hydro Mining Site.

Reserve a unit.

Tell us which site and how many MDUs. We will follow up on availability, delivery, and the lease.