Hosted MDUs

Buy a mining container. We host it at pass-through power + $0.01/kWh.

GoGo Tech (GoGo Technologies LLC) sells Modular Datacenter Units (MDUs) that miners own, and hosts them on GoGo Tech sites at the pass-through utility rate plus $0.01/kWh, with on-site technicians and operations software included.

You buy the unit from GoGo Tech, and the unit is yours. We place it on a GoGo Tech power site. Your monthly lease is the kilowatt-hours your MDU consumes, at the rate we negotiated for power, plus $0.01/kWh for management and operations. We don't mark up the power.

How it works

Can I buy a mining container and have someone host it?

Yes, that's our model. GoGo Tech controls the whole cycle.

  1. 01

    Buy the MDU

    You purchase a Modular Datacenter Unit from GoGo Tech. The unit is yours.

  2. 02

    We deploy it on our site

    GoGo Tech installs the unit on a GoGo Tech power site.

  3. 03

    Sign a kWh lease

    You sign a lease, and the monthly fee is based on the kilowatt-hours your MDU consumes, measured by the smart meters on every MDU.

  4. 04

    Pass-through rate

    GoGo Tech passes through the rate it negotiated for power, plus $0.01/kWh for management and operations.

  5. 05

    Technicians and software

    On-site technicians deploy and service your miners. The operations software is included at no extra charge with every MDU on our sites.

What you own
The MDU.
What GoGo Tech provides
The site, power procurement, deployment, on-site technicians, and the operations software.

Pricing

Pass-through power pricing

GoGo Tech uses pass-through pricing: the power rate negotiated for the site, passed through without markup, plus $0.01/kWh for management and operations.

Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

The line items, the trade-off against all-in hosting, and the worked example (ILLUSTRATIVE ONLY) are on the pass-through pricing page.

How pass-through pricing works

Sites

Current sites and capacity

Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.

'Hydro' refers to liquid (water) cooling of the miners, not hydroelectric power. Fort Worth runs on ERCOT grid power.

SiteStatusPowerCoolingMDU offeredMDU priceMiners
Fort Worth, TexasIn development. No commercial-operation month has been set. Oncor is building the power lines.ERCOT grid. PPA with Shell Energy, with API purchases from the ERCOT wholesale pool. Utility: Oncor.Hydro-cooled (water-cooled miners).2 MW MDUs; 12 MW available now and an 18 MW second phase$1,200,000 eachWhatsMiner, SealMiner, VolcMiner, Auradine
North Dakota natural-gas sitesTwo 5 MW sites, in operation since January 2026 and March 2026.Off-grid. Natural-gas generators owned and maintained by GoGo Tech (gensets by Taylor Power Systems), gas purchase agreement with Phoenix Energy, PPA issued by GoGo Tech.Air-cooled1 MW each; 340 slots, 3 panels$500,000 eachAny air-cooled miner

Company

Track record

  • Operating in Bitcoin mining since 2014. GoGo Technologies LLC formed January 18, 2018. Privately held.
  • Built a 1.75 MW mining site in Washington (2018), under management.
  • Built and managed infrastructure for 3,000+ Nvidia GPUs across 5 facilities in Washington (2022).
  • Built a 2.2 MW mining site in Washington (2024), under management.

FAQ

Can I buy a mining container and have someone else host it?

Yes. You buy a Modular Datacenter Unit (MDU) from GoGo Tech, and we deploy and host it on a GoGo Tech site. You pay a monthly lease based on the kWh the MDU consumes, at the pass-through power rate plus $0.01/kWh for management and operations.

Do I own the MDU, or am I renting it?

You own it. You buy the MDU from GoGo Tech, and the unit is yours. The lease covers hosting on our site, billed by the kWh consumed.

How much does hosting cost per kWh?

It's the power rate GoGo Tech negotiated for the site, passed through without markup, plus $0.01/kWh for management and operations. The operations software is included at no extra charge. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

What's the difference between pass-through and all-in hosting pricing?

An all-in rate bundles power, operations, and the provider's margin into one number. With GoGo Tech's pass-through pricing, you pay the actual negotiated power rate plus a fixed $0.01/kWh operations fee. That means your bill follows the underlying power cost, and the operations fee stays the same. GoGo Tech does not quote an all-in rate. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

Who installs and repairs my miners?

GoGo Tech's on-site technicians deploy and service your miners. The included software syncs with your mining pool to show live status for each miner, so technicians can find and fix issues quickly.

Which miners can I run in a GoGo Tech MDU?

North Dakota air-cooled MDUs (1 MW, 340 slots): any air-cooled miner. Fort Worth hydro-cooled MDUs (2 MW): WhatsMiner, SealMiner, VolcMiner, and Auradine.

Where are the sites, and when is Fort Worth available?

North Dakota: two 5 MW natural-gas sites (operating since January and March 2026). Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.

Reserve a unit.

Tell us which site and how many MDUs, and we'll follow up on availability, delivery, and the lease.