GoGo Tech sells air-cooled 1 MW Modular Datacenter Units (340 slots, 3 panels, $500,000 each) that accept any air-cooled miner, hosted on GoGo Tech's North Dakota natural-gas sites at pass-through power + $0.01/kWh, with technicians and operations software included.

How it works

Buy the unit. We host it on a North Dakota natural-gas site.

  1. 01

    Buy the MDU

    You purchase an air-cooled 1 MW Modular Datacenter Unit from GoGo Tech. It has 340 slots and 3 panels, it costs $500,000, and it accepts any air-cooled miner. The unit is yours.

  2. 02

    We deploy it on our site

    GoGo Tech installs the unit on a GoGo Tech North Dakota natural-gas site.

  3. 03

    The monthly charge follows kilowatt-hours

    The monthly hosting charge is the kilowatt-hours your MDU consumes, measured by the smart meters on the unit.

  4. 04

    Pass-through power and operations

    Power is passed through without markup, plus $0.01/kWh for management and operations. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh. On-site technicians deploy and service your miners, and the operations software is included.

Power

Why natural-gas power

  • The sites are off-grid. Power for this hosting is generated on site, not taken from the utility grid.
  • GoGo Tech owns and maintains the natural-gas generators. The gensets are from Taylor Power Systems.
  • Fuel is supplied under a gas purchase agreement with Phoenix Energy.
  • GoGo Tech issues the power purchase agreement.

Pricing

How pass-through pricing works

Hosting on these sites is the kilowatt-hours the MDU consumes. Power is the rate for the site, passed through without markup, plus $0.01/kWh for management and operations. The worked example, and how the two lines move, is on the pass-through pricing page.

Pass-through pricing

Company

Track record

  • Operating in Bitcoin mining since 2014. GoGo Technologies LLC formed January 18, 2018. Privately held.
  • Built a 1.75 MW mining site in Washington (2018), under management.
  • Built and managed infrastructure for 3,000+ Nvidia GPUs across 5 facilities in Washington (2022).
  • Built a 2.2 MW mining site in Washington (2024), under management.

FAQ

What is bitcoin mining hosting in North Dakota with GoGo Tech?

GoGo Tech sells air-cooled 1 MW Modular Datacenter Units (340 slots, 3 panels, $500,000 each) that accept any air-cooled miner, hosted on GoGo Tech's North Dakota natural-gas sites at pass-through power + $0.01/kWh, with technicians and operations software included.

What size is the North Dakota MDU, and what does it cost?

It is an air-cooled 1 MW Modular Datacenter Unit with 340 slots and 3 panels. The price is $500,000 each. It accepts any air-cooled miner.

Do I own the Modular Datacenter Unit?

Yes. You buy the MDU from GoGo Tech, and the unit is yours. GoGo Tech hosts it on a North Dakota natural-gas site. The monthly hosting charge is the kilowatt-hours the MDU consumes.

How is North Dakota hosting priced?

Power is pass-through: the rate for the site, passed through without markup, plus $0.01/kWh for management and operations. Technicians and the operations software are included. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

Why natural gas, and is the power on the grid?

These North Dakota sites are off-grid. GoGo Tech owns and maintains the natural-gas generators. A gas purchase agreement supplies the fuel, and GoGo Tech issues the power purchase agreement.

Who deploys and services the miners?

GoGo Tech's on-site technicians deploy and service your miners. The operations software is included at no extra charge with every MDU on our sites.

How long has GoGo Tech been mining?

Operating in Bitcoin mining since 2014. GoGo Technologies LLC formed January 18, 2018. Privately held. Built a 1.75 MW mining site in Washington (2018), under management. Built and managed infrastructure for 3,000+ Nvidia GPUs across 5 facilities in Washington (2022). Built a 2.2 MW mining site in Washington (2024), under management.

Reserve a unit.

Tell us you want an air-cooled MDU on a North Dakota natural-gas site.