Hydro-cooled bitcoin mining hosting
Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.
Supported miners: WhatsMiner, SealMiner, VolcMiner, and Auradine.
Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power.
Fort Worth
Hydro-cooled MDUs on the ERCOT grid
Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.
FAQ
What is the current rate for hydro-cooled bitcoin mining hosting?
- Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh. Power is passed through without markup. The operations fee is $0.01/kWh for management and operations. The operations software is included.
Which miners does hydro-cooled hosting support?
- Fort Worth hydro-cooled MDUs (2 MW) support WhatsMiner, SealMiner, VolcMiner, and Auradine.
What does hydro-cooled mean?
- Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power.
Where is GoGo Tech's hydro-cooled site?
- Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. The site is in Fort Worth, Texas, on the ERCOT grid. No commercial-operation month has been set.
Has a commercial-operation month been set?
- No commercial-operation month has been set.
Reserve a unit.
Tell us you want a hydro-cooled MDU on the Fort Worth site.