Hydro-cooled MDUs and panels from $300,000 · Texas and North DakotaReserve hydro

Buy dedicated capacity

Dedicated capacity.Reserved for your MDU.

You're buying dedicated power capacity reserved for your MDU or panel, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase. When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. 3 months from contract to hashing.

Schematic of the GoGo Tech cycle: power generation, transmission and PPA, transformers, MDU, and operations.

Air-cooled

1 MW or a 300 kW panel.North Dakota.

Any air-cooled miner. Hosted in North Dakota. The 1 MW MDU runs on natural gas or grid; the 300 kW panel is natural gas only; the 500 kW panel is grid only.

1 MW MDU
$500,000 · Natural gas or grid
300 kW panel
$175,000 · Natural gas only
500 kW panel
$300,000 · Grid only
Slots
340 per 1 MW MDU
Panels
3 per 1 MW MDU, 300 kW each
Location
North Dakota
Purchase price (due in full at purchase)
Due in full
Air-cooled Modular Datacenter Units on a GoGo Tech natural-gas site.
North Dakota natural-gas capacity flier, page 1.Download the North Dakota natural-gas flier (PDF)
Hydro-cooled Modular Datacenter Units with roof dry coolers and pad-mount transformers.

Hydro-cooled

2 MW MDU, or a 1 MW or 500 kW panel.Texas or North Dakota.

Liquid-cooled miners, not hydroelectric power. Hosted in Texas (Fort Worth area) or North Dakota on natural gas or grid power.

2 MW MDU
$1,000,000 · Natural gas or grid
1 MW panel
$550,000 · Natural gas or grid
500 kW panel
$300,000 · Natural gas or grid
Miners
WhatsMiner, SealMiner, VolcMiner, and Auradine
Location
Texas (Fort Worth area) or North Dakota
Purchase price (due in full at purchase)
Due in full

Prefer to supply the container? Bring your own hydro container at $800,000 per 2 MW container.

Fort Worth Rosedale 18 MW hydro-cooled capacity flier, page 1.Download the Fort Worth hydro flier (PDF)

Gas or grid

Every size, either power source.

The agreement you sign depends on the power source. We do not name the utility.

Natural gasGrid
AgreementPurchase and Lease Agreement (PLA), plus a PPA issued by GoGo TechPLA only. GoGo Tech holds the utility PPA.
Power rate$0.035/kWh, fixed for 10 yearsNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.Pass-through, varies with the marketThe pass-through rate varies with the market. GoGo Tech holds the utility PPA. You do not sign a customer-facing PPA on grid.
Management$0.01/kWh
Monthly lease chargeMetered energy × the power rate + $0.01/kWh management

Configure your MDU.

Purchase price (due in full at purchase), energy deposit and the monthly lease charge, at 90% uptime. When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized.

Cooling
Size
Power

Location: North Dakota

Power rateNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.

Purchase price (due in full at purchase)

$500,000

Dedicated capacity (MDU + site infrastructure)

One-time

Purchase price (due in full at purchase)You're buying dedicated power capacity reserved for your MDU, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase.
$500,000
Energy depositOne month of estimated energy + management, due before your unit is energized
$29,565
Lead time
3 months from contract to hashing

Monthly

IT load
1 MW
Energy per month
657,000 kWh
Power at $0.035/kWhNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.
$22,995
Management at $0.01/kWh
$6,570
Monthly lease charge (metered energy + $0.01/kWh management)
$29,565

When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. On natural gas, you also sign a PPA issued by GoGo Tech. The rate is $0.035/kWh, fixed for 10 years. Estimate only. Billing follows the smart-meter reading.

Included

After you sign the PLA.

How it works

From contractto hashing.

3 months from contract to hashing

  1. 01

    Choose

    Pick your MDU or panel, air or hydro, and gas or grid power.

  2. 02

    Sign the PLA

    You sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. On natural gas you also sign a PPA issued by GoGo Tech, with the rate at $0.035/kWh, fixed for 10 years. On grid you sign only the PLA.

  3. 03

    We deploy

    We deliver, install and energize on our site.

  4. 04

    Hashing, billed per kWh

    The monthly lease charge is metered energy times the power rate, plus $0.01/kWh management.

Target: 3 months from contract to hashing

Readiness

What to decidebefore you buy.

One month of estimated energy + management, due before your unit is energized.

Cooling and size

  • Air-cooled: 1 MW MDU (gas or grid), 300 kW panel (gas only), or 500 kW panel (grid only)
  • Hydro-cooled: 2 MW MDU, 1 MW panel, or 500 kW panel (gas or grid)
  • Number of units

Power and site

  • Natural gas or grid
  • Air-cooled: North Dakota
  • Hydro-cooled: Texas (Fort Worth area) or North Dakota

Miners

  • Models and counts
  • Wall power per miner
  • Shipping date to site

Money and schedule

  • Purchase price (due in full at purchase): air-cooled 1 MW MDU $500,000; hydro-cooled 2 MW MDU $1,000,000; hydro-cooled 1 MW panel $550,000; other panels $175,000 or $300,000
  • Energy deposit: one month of estimated energy + management, due before your unit is energized
  • 3 months from contract to hashing
  • Sign the Purchase and Lease Agreement (PLA)

Reserve your capacity.

3 months from contract to hashing. Purchase price (due in full at purchase). Energy deposit: one month of estimated energy + management, due before your unit is energized.