Buy dedicated capacity
Dedicated capacity.Reserved for your MDU.
You're buying dedicated power capacity reserved for your MDU or panel, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase. When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. 3 months from contract to hashing.

Air-cooled
1 MW or a 300 kW panel.North Dakota.
Any air-cooled miner. Hosted in North Dakota. The 1 MW MDU runs on natural gas or grid; the 300 kW panel is natural gas only; the 500 kW panel is grid only.
- 1 MW MDU
- $500,000 · Natural gas or grid
- 300 kW panel
- $175,000 · Natural gas only
- 500 kW panel
- $300,000 · Grid only
- Slots
- 340 per 1 MW MDU
- Panels
- 3 per 1 MW MDU, 300 kW each
- Location
- North Dakota
- Purchase price (due in full at purchase)
- Due in full

Download the North Dakota natural-gas flier (PDF)
Hydro-cooled
2 MW MDU, or a 1 MW or 500 kW panel.Texas or North Dakota.
Liquid-cooled miners, not hydroelectric power. Hosted in Texas (Fort Worth area) or North Dakota on natural gas or grid power.
- 2 MW MDU
- $1,000,000 · Natural gas or grid
- 1 MW panel
- $550,000 · Natural gas or grid
- 500 kW panel
- $300,000 · Natural gas or grid
- Miners
- WhatsMiner, SealMiner, VolcMiner, and Auradine
- Location
- Texas (Fort Worth area) or North Dakota
- Purchase price (due in full at purchase)
- Due in full
Prefer to supply the container? Bring your own hydro container at $800,000 per 2 MW container.
Download the Fort Worth hydro flier (PDF)Gas or grid
Every size, either power source.
The agreement you sign depends on the power source. We do not name the utility.
| Natural gas | Grid | |
|---|---|---|
| Agreement | Purchase and Lease Agreement (PLA), plus a PPA issued by GoGo Tech | PLA only. GoGo Tech holds the utility PPA. |
| Power rate | $0.035/kWh, fixed for 10 yearsNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA. | Pass-through, varies with the marketThe pass-through rate varies with the market. GoGo Tech holds the utility PPA. You do not sign a customer-facing PPA on grid. |
| Management | $0.01/kWh | |
| Monthly lease charge | Metered energy × the power rate + $0.01/kWh management | |
Configure your MDU.
Purchase price (due in full at purchase), energy deposit and the monthly lease charge, at 90% uptime. When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized.
Location: North Dakota
Purchase price (due in full at purchase)
$500,000
Dedicated capacity (MDU + site infrastructure)
One-time
- Purchase price (due in full at purchase)You're buying dedicated power capacity reserved for your MDU, plus site infrastructure, power delivery and site improvements. The purchase price is due in full at purchase.
- $500,000
- Energy depositOne month of estimated energy + management, due before your unit is energized
- $29,565
- Lead time
- 3 months from contract to hashing
Monthly
- IT load
- 1 MW
- Energy per month
- 657,000 kWh
- Power at $0.035/kWhNatural gas power is $0.035/kWh, fixed for 10 years under GoGo Tech's PPA.
- $22,995
- Management at $0.01/kWh
- $6,570
- Monthly lease charge (metered energy + $0.01/kWh management)
- $29,565
When you buy an MDU or panel, you sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. On natural gas, you also sign a PPA issued by GoGo Tech. The rate is $0.035/kWh, fixed for 10 years. Estimate only. Billing follows the smart-meter reading.
Included
After you sign the PLA.
- Hosting
- Technicians
- Ops software
- Smart meters
- kWh billing
How it works
From contractto hashing.
3 months from contract to hashing
01
Choose
Pick your MDU or panel, air or hydro, and gas or grid power.
02
Sign the PLA
You sign the Purchase and Lease Agreement (PLA). The purchase price is due in full at purchase. The energy deposit is due before your unit is energized. On natural gas you also sign a PPA issued by GoGo Tech, with the rate at $0.035/kWh, fixed for 10 years. On grid you sign only the PLA.
03
We deploy
We deliver, install and energize on our site.
04
Hashing, billed per kWh
The monthly lease charge is metered energy times the power rate, plus $0.01/kWh management.
Target: 3 months from contract to hashing
Readiness
What to decidebefore you buy.
One month of estimated energy + management, due before your unit is energized.
Cooling and size
- Air-cooled: 1 MW MDU (gas or grid), 300 kW panel (gas only), or 500 kW panel (grid only)
- Hydro-cooled: 2 MW MDU, 1 MW panel, or 500 kW panel (gas or grid)
- Number of units
Power and site
- Natural gas or grid
- Air-cooled: North Dakota
- Hydro-cooled: Texas (Fort Worth area) or North Dakota
Miners
- Models and counts
- Wall power per miner
- Shipping date to site
Money and schedule
- Purchase price (due in full at purchase): air-cooled 1 MW MDU $500,000; hydro-cooled 2 MW MDU $1,000,000; hydro-cooled 1 MW panel $550,000; other panels $175,000 or $300,000
- Energy deposit: one month of estimated energy + management, due before your unit is energized
- 3 months from contract to hashing
- Sign the Purchase and Lease Agreement (PLA)
Reserve your capacity.
3 months from contract to hashing. Purchase price (due in full at purchase). Energy deposit: one month of estimated energy + management, due before your unit is energized.
