Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.
Supported miners: WhatsMiner, SealMiner, VolcMiner, and Auradine.
Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. The Fort Worth hydro-cooled mining project runs on ERCOT grid power.
The unit
The 2 MW hydro-cooled unit
- You purchase a hydro-cooled 2 MW Modular Datacenter Unit from GoGo Tech. The price is $1,200,000, and the unit is yours.
- Supported miners: WhatsMiner, SealMiner, VolcMiner, and Auradine.
- GoGo Tech delivers and installs the MDU at the Fort Worth hydro-cooled bitcoin mining project. It is not shipped to a buyer address. The published price does not add a separate shipping charge.
- The sale is arranged directly with GoGo Tech.
- After the unit is on site, hosting is the kilowatt-hours it consumes: pass-through power plus $0.01/kWh for management and operations. On-site technicians and the operations software are included. Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.


Cooling
Liquid cooling, not hydroelectric power
- Hydro-cooled means the miners are liquid (water) cooled.
- It does not mean hydroelectric power. The Fort Worth hydro-cooled bitcoin mining project runs on ERCOT grid power.
- This is a different machine from the air-cooled 1 MW MDU (340 slots, 3 panels, $500,000, any air-cooled miner) hosted on GoGo Tech's North Dakota natural-gas sites, in operation since January 2026 and March 2026.
Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. The Fort Worth hydro-cooled mining project runs on ERCOT grid power.
Fort Worth
Fort Worth hydro-cooled bitcoin mining
The Fort Worth hydro-cooled bitcoin mining project is 18 MW, sold as 2 MW MDUs at $1,200,000 each. No commercial-operation month has been set. Oncor is building the power lines for the hydro-cooled mining project. The unit is a preorder.
Power procurement for the hydro-cooled mining project — the ERCOT pool, the Shell Energy PPA, and Oncor — is on the Texas hosting page.
FAQ
What is the current rate for hydro-cooled bitcoin mining hosting?
- Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh. Power is passed through without markup. The operations fee is $0.01/kWh for management and operations. The operations software is included.
Which miners does hydro-cooled hosting support?
- Fort Worth hydro-cooled MDUs (2 MW) support WhatsMiner, SealMiner, VolcMiner, and Auradine.
What does hydro-cooled mean?
- Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. The Fort Worth hydro-cooled mining project runs on ERCOT grid power.
Where is GoGo Tech's hydro-cooled site?
- The Fort Worth hydro-cooled bitcoin mining project is 18 MW, sold as 2 MW MDUs at $1,200,000 each. The hydro-cooled mining project is in Fort Worth, Texas, on the ERCOT grid. No commercial-operation month has been set.
Has a commercial-operation month been set?
- No commercial-operation month has been set.
Is the hydro-cooled MDU shipped to me?
- No. GoGo Tech delivers and installs the unit at the Fort Worth hydro-cooled bitcoin mining project. It is not shipped to a separate buyer address, and the published price does not add a shipping charge. The sale is arranged directly with GoGo Tech.
How is hydro-cooled hosting different from North Dakota?
- Hydro-cooled hosting is a 2 MW unit at the 18 MW Fort Worth hydro-cooled bitcoin mining project, for WhatsMiner, SealMiner, VolcMiner, and Auradine, and it is a preorder. North Dakota hosting is an air-cooled 1 MW unit (340 slots, 3 panels, $500,000, any air-cooled miner) on natural-gas sites that have been in operation since January 2026 and March 2026.
Reserve a unit.
Tell us you want a hydro-cooled MDU on the Fort Worth mining project.