Hydro-cooled

Hydro-cooled bitcoin mining hosting

Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh.

Supported miners: WhatsMiner, SealMiner, VolcMiner, and Auradine.

Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power.

Fort Worth

Hydro-cooled MDUs on the ERCOT grid

Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. No commercial-operation month has been set.

Bitcoin mining hosting in Texas

FAQ

What is the current rate for hydro-cooled bitcoin mining hosting?

Current rate: Power (pass-through) $0.035 / kWh + Ops fee $0.01 / kWh = $0.045 / kWh. Power is passed through without markup. The operations fee is $0.01/kWh for management and operations. The operations software is included.

Which miners does hydro-cooled hosting support?

Fort Worth hydro-cooled MDUs (2 MW) support WhatsMiner, SealMiner, VolcMiner, and Auradine.

What does hydro-cooled mean?

Hydro-cooled means the miners are liquid (water) cooled; it does not mean hydroelectric power. Fort Worth runs on ERCOT grid power.

Where is GoGo Tech's hydro-cooled site?

Fort Worth is a 30 MW hydro-cooled site: 12 MW available now and an 18 MW second phase, sold as 2 MW MDUs. The site is in Fort Worth, Texas, on the ERCOT grid. No commercial-operation month has been set.

Has a commercial-operation month been set?

No commercial-operation month has been set.

Reserve a unit.

Tell us you want a hydro-cooled MDU on the Fort Worth site.